Our Work

Guar Gum for Offshore Energy (Barrow Island, WA)

600+ tonnes (2023–2024)

≤ 50 days delivery (from order)

1 site: Barrow Island, WA

2 tests on bulk bags (cyclic lift + load-to-failure)

MPL supported a major offshore energy program with high-volume guar gum supply delivered into an ecologically sensitive environment. By combining predictable logistics with strict biosecurity controls and verified handling documentation, MPL helped the client maintain drilling continuity without compromising safety or compliance.

The Challenge

A major offshore energy project required more than 600 tonnes of guar gum across 2023 and 2024, delivered to Barrow Island, a Class A Nature Reserve with strict biosecurity controls. The project needed reliable bulk supply for a horizontal drilling program, with delivery within tight timeframes and zero tolerance for compliance failures. Packaging presented additional risk, as bulk bags and pallets can introduce pests and contaminants. The client also required confidence that lifting and handling of bulk bags would be safe and verified before shipment.

The Solution

MPL planned the supply program around the client’s drilling schedule and committed to end to end coordination from order to delivery. To meet biosecurity requirements, bulk bags and wooden pallets were fumigated prior to loading at port, reducing the risk of invasive pests and contamination. MPL arranged independent laboratory testing, including cyclic top lift testing and final load to failure testing on bulk bags. Test reports were supplied to the client before shipping to confirm compliance and support safe handling procedures on site.

The Result

MPL delivered consignments within 50 days from the date of order, maintaining continuity of supply for the drilling program while meeting the additional compliance requirements of an ecologically sensitive location. The fumigation process and verified bulk bag testing supported biosecurity and safety expectations, reducing operational risk for the client and simplifying site handling approvals. With reliable logistics, quality assurance documentation, and consistent communication, MPL helped the project maintain momentum without delays, demonstrating capability to supply large volumes into remote environments with strict regulatory constraints.

Our Work

Check out our other projects

Guar Gum for Talc Suppression in Gold Processing (Geraldton Area, WA)

MPL supported a gold processing operation in the Geraldton area to address talc-related performance impacts by supplying the right guar gum product for trialling and scale-up. From lab samples through to a plant trial and ongoing production supply, MPL helped reduce adoption risk and maintain processing continuity once performance gains were confirmed.
Read More

PVC Blastpipes for Manganese Mine (Pilbara, WA)

MPL supported a time-critical blasting operation below water table in the Pilbara by sourcing and delivering high-volume PVC blastpipes to specification. With tight project timelines and remote site logistics, MPL coordinated procurement and freight to deliver on-time, while meeting commercial expectations for cost and delivery performance.
Read More

Castor Oil and Derivatives for Lubrication (WA)

MPL supported drilling fluid manufacturers in Western Australia with a stable, high-volume castor oil supply program. By coordinating international sourcing and repeat import logistics to a predictable schedule, MPL helped protect production continuity, reduce supply uncertainty, and keep year-round lubrication inputs available on time.
Read More

Ferrosilicon for Dense Media Separation (Pilbara, WA)

MPL delivered a consistent ferrosilicon supply program for dense media separation in the Pilbara, coordinating multi-origin sourcing to meet strict quality requirements while maintaining price competitiveness and on-time delivery. By aligning procurement and logistics to processing demand, MPL helped reduce supply risk and minimise inventory pressure.
Read More